In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

which sentence expresses information in the positive form: A. I'm neither on time nor prepared B. I prefer to arrive on time C. I don't like to arrive on time D
Which additional word in the sentence should be capitalized? Do you like Robert Frost's poem "Stopping by Woods on a snowy Evening"? A. By B. You C. On D. Snowy
In right triangle ABC with the right angle at C, sin A= 2x + .1 and cos B = 4x - .7. Determine and state the vaule of x.
Is a ziggurat still used today?
Which best describes the writing in City? A. fiction, with numerous opinions B. opinion, with few facts C. factual, with no opinions D. nonfiction, with fic
what amendment gives us freedom of religion
The "Iliad" and the "Odyssey" are important because they __________. A. tell the true history of the Trojan War B. are great works of literature that help us C.
By how many is 3/4 of 20 greater than 3/5 of 20
What year did Magellan set sail for circumnavigating the world
Which words in the sentence below are nouns? I dropped my phone in the pool.