kelvinkibalama kelvinkibalama
  • 02-03-2022
  • Business
contestada

what is changing risk​

Respuesta :

pompomsquad33 pompomsquad33
  • 02-03-2022

Answer:

here:

Explanation:

A change risk is the probability that a change program will not reach its stated objectives and goals. There is a wide range of factors that will increase the change risk for a project, and so it is important to conduct an effective risk change assessment to understand, document, and reduce these change risks.

Answer Link

Otras preguntas

There are five cars in line at a stoplight. Each of these cars is a different color and different type of car. Diego is driving the red car. Ingrid is driving t
A physician orders 70mg of a particular medication be administered to a patient. The medication on hand has 40mg/capsule. How many capsules should be given to t
y=|-3x 2|-4 what's the answer
what happens when we put oil into water? a. mixture is created. b. oil will dissolve in water. c. oil will separate from the water.
Lee bottes sont grandes
In "Through the Tunnel," what could be seen as a symbol for Jerry's passage into manhood? a.the beach b.the local boys c.the foreign place d,the underwater tunn
what is a meteor that hits the ground called
Express the sum of each pair of numbers as a product of greatest common factor of the numbers and another sum
What process produces the sediments that ultimately lead to soil formation? rainfall leaching topography weathering
is .009 a integer or not