which was the first hydropower situation of Nepal?​

Respuesta :

408478
408478 408478
  • 02-10-2021

Answer:

Pharping

Explanation:

The first hydropower project in Nepal was commissioned on 22nd May 1911 (inaugurated by late King Prithvi Bir Bikram Shah) in Pharping, about 10 km south of Kathmandu, using water from two spring sources, Satmule and Shikha Narayan3, with installed capacity of 500 kW.

Answer Link

Otras preguntas

In addition to replacing the president if necessary, it's the duty of the vice president to
Container a and b hold 11,875 liters of water altogether. Container b holds 2,391 liters more than container a holds. How much water does container a hold?
A schoolbook has 376 pages.There are six pages in each chapter. How many pages are left over for the contents and answers?
An estate valued at $75,000 is divided among three daughters. In the ratio 5:8:2 respectively. Calculate the amount each receives
Sue needs 2 1/3 cups of flour for a batch of cookies. How many complete batches can she make with 10 cups of flour?
How much does the element Radon cost per pound
What type of map shows you mountains,rivers,and lakes
Greg ran 3 times as far as jed.rj ran 0.1times as far as Greg. If jed ran25 yards, how far did Greg and rj run
what would result if chromosomes did not replicate during interphase
An average person in the United States throws away 4.5 × 10–1 kg of trash per day. In 2013, there were about 3.2 × 106 people in the U.S.About how many kilogram