krishnashrrstha41
krishnashrrstha41 krishnashrrstha41
  • 04-08-2021
  • Mathematics
contestada

15men can complete a piece of work in25days. how many men should be added to complete the same work in15days.​

Respuesta :

mhanifa
mhanifa mhanifa
  • 04-08-2021

Answer:

  • 10 men

Step-by-step explanation:

Amount of work done by 15 men is:

  • 15 men *25 day = 15*25 man*days

Same work can be done by 25 men, in 15 days, so 10 more men should be added.

Answer Link
abovejosh
abovejosh abovejosh
  • 04-08-2021
Answer: 10 men explanation: guy above me
Answer Link

Otras preguntas

Prior to the ratification of the constitution, the united states was governed by the articles of __________.
Is the major monosaccharide found in the body?
How many cubic blocks of side length 1/6 inch would it take to fill a cube with a side length of 2/6 inch
What is significant of "was it a dream"
Examples of ____________ technology include oil refineries and automated chemical processing plants.
rewrite fraction 3/4 with denominator of 12.
Scientific theories are more like laws than hypotheses. True False
In some towns and cities in America, some of the youth of today are getting into trouble after the traditional school day ends. However, there is a possible sol
When ammonium nitrate is dissolved in water, energy is absorbed from the surroundings, causing a decrease in the resulting solutions temperature. Which best des
What is the net ionic equation of the reaction of BeCl2 with NaOH