ginapogones6676 ginapogones6676
  • 02-07-2021
  • Business
contestada

A costing system that uses actual costs for direct materials and labor and predetermined overhead rates to apply overhead is called a(n)

Respuesta :

topeadeniran2 topeadeniran2
  • 07-07-2021

Answer: normal costing system

Explanation:

A costing system which uses the actual costs for direct materials and the labor and predetermined overhead rates to apply overhead is referred to as the normal costing system.

Normal costing system is the cost allocation method whereby cost is assigned to products which are based on the labor, materials, and the overhead which are used in their production.

Answer Link

Otras preguntas

Why did the americans go to Oregon during manifest destiny and why did the mormon go to utah??
Why can't we change the subscripts in balancing chemical equations?
write a paragraph for me using these words: art critic and art historian
Why didn't the first stars to form have solar systems with Earth like planets and satellites?
Why might nations join together to remove trade barriers?
A basketball has been left out in the cold. The next day you find that it has become soft. What do you do to get it back to shape and why?a) Leave it alone to w
How many corners are in a rectangle and how many flat faces
The surface area of a triangular pyramid is 375.2 m2. What would change if the surface area were measured in square centimeters?
Why might nations join together to remove trade barriers?
A sighting from sea level to the top of a lighthouse was 60°. The lighthouse is known to rise 180 feet above sea level. What is the distance (to the nearest foo