shresthasamrachana06
shresthasamrachana06 shresthasamrachana06
  • 01-04-2021
  • Mathematics
contestada

12 workers can do a peice of work in 20 days. How many workers should be added to complete work in 16 days?​

Respuesta :

atchleyamirah69
atchleyamirah69 atchleyamirah69
  • 01-04-2021
3 workers

if 12 workers can do a piece of work in 20 days, then one person can do it in 240 days. 240/16 is 15. That is the number of workers that you need in total to it in 16 days. Since the question ask how many more workers,
15 - 12 = 3 more workers.
Answer Link

Otras preguntas

Which is not a good step to take if you want to stay drug free? Keep friends who use drugs. Find someone to talk to. Participate in alternate activities
Which event occurred in 1963 and caused the country to experience a major transition? the election of President Johnson the assassination of President Kennedy t
Are humans civilized?
How are women most important to the survival of the Lgbo culture and traditions
Subtract 8 1/2 - 2 2/3 = ?
Theresa is planning to make a plastic cover for her new globe to keep it from being damaged. If Theresa’s new globe has a radius of 3 inches, then how much plas
What are the advantages of the fine wools? ( 3 examples )
A group of people were given a personality test to determine if they were Type A or Type B. The results are shown in the table below:
Jessica ran 400 feet in 4 minutes how long would it take her to run 1,200 feet how many feet can she can run in 10 minutes?
What is the law of sllyogism in symbolic form?