gamingwithm968 gamingwithm968
  • 02-03-2021
  • Mathematics
contestada

You earn $6 per hour for pulling the weeds, you earned $15 last weekend. How many hours did you work last week?

Respuesta :

harutosanimations
harutosanimations harutosanimations
  • 02-03-2021

Answer:

thats a bad job. and you worked 2 hours and 30 minutes i think

Step-by-step explanation:

Answer Link

Otras preguntas

If a force of 40 newtons moves a cart a distance of 9 meters, the work done is Nm. If the same force moves the same cart three times that distance, the work do
The mean of a normally distributed dataset is 12, and the standard deviation is 2. % of the data points lies between 8 and 16.
The third movement of Antonin Dvořák's "String Quartet in F Major" contains a light-hearted passage in a fast tempo and in triple meter called a A. sc
Need help question15
Marquis company estimates that annual manufacturing overhead costs will be $874,000. estimated annual operating activity bases are direct labor cost $494,000, d
Which is NOT a characteristic of Baroque architecture?
A contractor is building a circular swimming pool. The radius of the circle 12 feet. He needs to know the circumference in order to buy tile to put around the e
Find the value of 2a² + 5b² when a= -6 and b= 2
what is the eleventh term in the sequence An=-6n+13 a -79 b 53 c 79 d -53
Rodney is making three pizzas. The recipe says that, for one pizza, he needs 2 cups of flour, 2 teaspoons of instant active dry yeast, 2 cloves of garlic, 1 tab