A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

which of the following is a way to get more sleep ? a. read a tablet before going to bed b . exercise regularly c. both a n b
The Liaison Officer: a. Tracks resources and maintains incident documentation. b. Provides information to the public. c. Is the point of contact for other re
Joly used 4 strips of ribbon to decorate a box. Each strip was 6.15 cm long. How much ribbon did Joly use altogether? a.)2.46 cm b.)24.4 cm c.)24.6 cm d.)25 cm
A lack of some basic biological requirement such as water, which produces a drive to obtain that requirement, is known as the?
The length of a rectangle is represented by (6x − 2), and the width is represented by (x − 1). Which expression best represents the area of the rectangle?
A desiccant is another name for a water molecule TRUE FALSE
What's 7/8 as a decimal? a. 7.8 b. .875 c. 8.7 d. .78
What is the harmful impact the use of insecticide has on the environment
a car traveling at 20 m/s starts to decelerate steadily it comes to a complete stop in 10s .what is its acceleration
Ground water contains what?