Smarie18 Smarie18
  • 04-01-2021
  • Engineering
contestada

What is the preferred approach to risk mitigation?

-Tolerate
-Transfer
-Terminate
-Treat

Respuesta :

oeerivona oeerivona
  • 08-01-2021

Answer:

The correct option is;

Terminate

Explanation:

Termination of the risk is equivalent to elimination of the risk by avoiding the activity that brings about the risk or by using a different process that does not include the risk observed in the previous process option

When the reward far outweigh the risk, it may be decided to terminate or eliminate the risk and miss the reward and also terminate the likelihood of the losses to be incurred.

Answer Link

Otras preguntas

Points points points
Write the equation of the line that passes through the points (1,2) and (9,-4)
Question 1 Why is water necessary for living organisms? All organisms need water to stay clean. All organisms need water as an energy source. A
What is the theme of the story
Write (-5 + 8i) + (-5 − 8i) as a complex number in standard form. A) 10 − 13i B) -10 + 13i C)-10 + i D)-10
Which word is best related to the underlined word in the paragraph and how do the words relate? My mother is a patron of the Snip and Clip Beauty Shop. My dad
Help how do I solve this
Given: x + 2 < -5. Choose the solution set.
the decay constant of a radioactive element is -0.533 per minute. If a sample of the element weighs 50 grams, what will be its weight after two minutes? (probab
If 4 miles of sodium react, how many moles of chlorine gas will react? 2Na + Cl2 ---> 2NaCl