When multiple architects work on a construction plan, which section of a construction plan will help them keep track of when the changes are made and by whom?
A.
framing plan
B.
schedule
C.
title block
D.
bill of materials

Respuesta :

katusukibakugoisgod
katusukibakugoisgod katusukibakugoisgod
  • 07-12-2020

Answer:

I believe that it is . A. framing plan

Explanation:

But I am not certain But I do know that it IS NOT B..

Answer Link
ewachi101 ewachi101
  • 26-08-2021

Answer:

the answer is schedule!!!

Explanation:

Answer Link

Otras preguntas

a normal window is constructed by adjoining a semicircle to the top of an ordinary rectangular window, (see figure ) The perimeter of the window is 12 feet. wh
What differentiates baseline activities from health-enhancing activities?
a normal window is constructed by adjoining a semicircle to the top of an ordinary rectangular window, (see figure ) The perimeter of the window is 12 feet. wh
Which of the lines from the poem How do I love thee? (Sonnet 43) contains a change in intonation? A. I love thee freely, as men strive for Right; B. How do I lo
Tamala had a bad day because she forgot her wallet keys, sunglasses, and backpack at home. What correction, if any, should be made to this sentence? A. Remove t
Sarah has going to work for 60 days. On 39 of those days she arrived at work before 8:30 AM. On the rest of the day she arrived after 8:30 AM. What is experimen
Next four multiples of a unit fraction one half
solve for y by using elimination -4x + 8y = 10 7x + 9y = 19
Why is RNA chemically unstable?
Can drinking too much water be bad for you?