ballerstatus4289 ballerstatus4289
  • 02-03-2020
  • Business
contestada

In an activity-based costing system, what should be used to assign a department’s manufacturing overhead costs to products produced in varying lot sizes?

Respuesta :

Remzwisdom
Remzwisdom Remzwisdom
  • 03-03-2020

Answer: Multiple cause-and- effect relationship should be used

Explanation:

A multiple cause-effect relationship is a relationship in which an event (the cause) makes another event happen (the effect).

A particular cause can have several effects.

Answer Link

Otras preguntas

Given the recursive formula shown, what are the first 4 terms of the sequence?
The ratio of two numbers is 9 to 8, and their sum is 187. What are the numbers?
What is the name of the structure labeled C in the diagram below?
A person always feels hungry, even a short time after eating. This person also has high blood calcium levels. This person could have a disorder with which gland
The radius of a circle is 3 cm. Find its area in terms of pi
The trait for flower color in a plant has red and white alleles. The red color is the dominant trait. What is the phenotypic ratio for a cross between plants wi
Solve this question:Зх <-24
Which elements cause the catastrophe in Act scene Romeo and Juliet? Select 3 options. D Romeo mistakenly believes Juliet is dead when he sees her lying in the t
Campbell, J. (1988). "The Journey Inward." The Power of Myth. What information is missing from this entry but required by APA style? a. month of publication
Which is not a water quality monitoring parameter ? 1. Habitat 2. Turbidity 3.salinity 4. Ph level