_ is an important management tool that is used to monitor and manage that contract and/or project

Respuesta :

josephsmith041496
josephsmith041496 josephsmith041496
  • 05-01-2020

Answer:

Earned Value Management (Even)

Explanation:

Even is the best management tool for monitoring the performance of a project by emphasizing the planning and integration of program cost.

Answer Link

Otras preguntas

Indicate the equation of the line that is the perpendicular bisector of the segment with endpoints (4, 1) and (2, -5).
Situation: A 39 gram sample of a substance that's a by-product of fireworks has a k-value of 0.1024. N = N0e -kt N0 = initial mass (at time t = 0) N = mass at t
When Beowulf requests that he alone “May purge all evil from this hall,” what does he mean by purge? A. drive out B. overcome C. cleanse D. bury
In areas where crops were most abundant, slave labor was inexpensive. Because slaves were easily replaced, what often occurred?
In 1939, with the u.s. economy not yet fully recovered from the great depression, president roosevelt proclaimed that thanksgiving would fall a week earlier tha
If a normal distribution has a mean of 44 and a standard deviation of 8, what is the z-score for a value of 46?
I'm not sure how to solve this problem. I get none of the answers
What is the length of ? Round to the nearest tenth.
A Spanish scientist observes that salmon produce more eggs when grown in warmer aquariums. He asks his colleague in the United States to conduct the same experi
which factor helped cause the defeat of napoleon during his invasion of russia