​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

what is 1km=0.6mi 5km=?
Write a real world scenario that matches the following equation. 15+3h=30 Then solve for the eq
what is the equivalent fraction for 35/40
one recipe for pancakes says to use 1 1/2 cup of mix to make 7 pancakes. How much mix is needed to make 35 pancakes?
after an earthquake, additional adjustments can occur along the fault. these adjustments can cause damaging viberations called
the __________________ of a word is most useful to understand its connotation(s). a. dictionary entry c. context b. part of speech d. root word
how did the renaissance motivate europeans explorers
how is 721 expanded form written
which of the following statements about peer presure is true a.peer pressure is always verbal b. peer pressure is the only reason teenagers get into drugs c.som
You have decided to use a worksheet to keep track of your monthly income and expenses. What categories might your worksheet include? How would you determine t