lillymcginn lillymcginn
  • 02-11-2019
  • Mathematics
contestada

A lift that weighs 300N moves a man with a weight of 950N upwards by 12m. How much work is done to move the lift this height?

Respuesta :

skyluke89
skyluke89 skyluke89
  • 07-11-2019

Answer:

15,000 J

Step-by-step explanation:

Since the lift also carries the man, the total weight of the man+lift system is

[tex]F=300 N + 950 N = 1250 N[/tex]

The work done in moving the lift upward is

[tex]W=Fd[/tex]

where

F is the weight of the lift+man combined system

d is the displacement

In this problem,

F = 1250 N

d = 12 m

Substituting,

[tex]W=(1250)(12)=15,000 J[/tex]

Answer Link

Otras preguntas

Compare Netherlandish art to Renaissance art. What are the similarities and differences?
what is the cube root of 27/64?​
Write an article for publication in your school magazine on the importance of education​
please help 100 points 1. What was Reagan’s strategy for dealing with the Soviet Union, and how did it differ from his predecessors. 2. What factors brought ab
Find the mean median mode and range for the following data 77 60 59 70 89 95
show that (3*8*x)^7= 6^7*8^7*x^7
Andrew Jackson created conflicts by removing American Indians from the southeastern United States because: A. many American Indians violently resisted removal p
8x+21+16x=25x+19 solve
i need help with this, graphing
What did the Soviet Union lose from the Cuban Missile Crisis?