caden1302 caden1302
  • 03-05-2019
  • Business
contestada

In a turnkey project, the contractor agrees to handle every detail of the project for a foreign client.

a. True

b. False

Respuesta :

Eureka1Fa
Eureka1Fa Eureka1Fa
  • 03-05-2019

It is true.

Trust me:)

Answer Link

Otras preguntas

Adjectives and Adverbs 1. Which word in the sentence is an adjective? Our former coach lived in Lima, Peru, until 2008. A. coach B. former C
explain why the Homestead Act was attractive to settlers.
what is the value of the 8 in 3.872 and the value of the 4 in 0.194
Make a case for the Native Americans’ right to remain on the Western Plains.
is the original climax community in an ecosystem more likely to be restored after a natural disturbance or a human-caused disturbance?
What states made up the upper south?
mason is growing tomatoes in his garden this year. every 1.5 ft of stalk yields about 3.4 lbs of tomatoes. he has four plants with a combined stalk lenghth of 1
can someone describe the process of meiosis?
The question says, A baseball player reaches first base 30% of the times he is at bat. Out of 50 times at bat, about how many times will the player reach first
What is 72% as a fraction and decimal