JaymezMerfy1002 JaymezMerfy1002
  • 01-10-2018
  • Computers and Technology
contestada

Which term describes the complexity of a document

Respuesta :

narstarolor
narstarolor narstarolor
  • 06-11-2020

Answer:

Work breakdown structure (WbS)

Explanation:

A work-breakdown structure in project management and systems engineering, is a deliverable-oriented breakdown of a project into smaller components. A work breakdown structure is a key project deliverable that organizes the team's work into manageable sections, and also defines its complexity.

Please let me know if this helped

Answer Link

Otras preguntas

what is 8/10 estimated to
PLEASE HELP ME?? 10 POINTS?! HELP ASAP.
Whatwhat does the figurative language He kept his eyes on the rocky peaks that jutted into the sky jagged sharks teeth."mean
A circus act has 3 times as many elephants as acrobats. Jorge noticed that all together there were 56 legs in the circus ring. How many elephants were in the sh
Read these lines from Denise Levertov's poem "In Thai Binh (Peace) Province": It is that life, unhurried, sure, persistent, I must bring home when I try to brin
Who invented chairs?
if 48 is 10% then what is 100%
Gabriel determined that his total cost would be represented by 2.5x + 2y – 2. His sister states that the expression should be x + x + 0.5x + y + y – 2. Who is c
composition about "the day i ran away" with 500 words
The percent efficiency of a machine can never be 100% (or greater), because in the real world some energy is always converted into _____. A. heat B. work C.