stevenfowler123 stevenfowler123
  • 02-06-2018
  • Business
contestada

If your company has a large production-related task, such as assembling an airplane, what strategy could help you increase productivity?

Respuesta :

Аноним Аноним
  • 02-06-2018
i would say mechanical workers. kinda like robots because they can work 24/7

Answer Link
maddyk5025
maddyk5025 maddyk5025
  • 01-02-2021

Answer:

Division of Labor

Explanation:

Edge 2021 (Quizlet)

Answer Link

Otras preguntas

Please help me on 7G thank you :)
How many holocaust survivors are still alive 2017?
1. This photograph was taken at a location on Mount Saint Helens called Meta Lake. The area was clear-cut before the volcano erupted in 1980, meaning that all t
What is one way that Emperor Qian Long responds to King George III's messengers?
What are some factors limiting the carrying capacity of the Earth?
Japanese losses were staggering in comparison: an estimated 1.74 million killed or missing, and 94,000 wounded. Few Japanese troops surrendered, instead choosin
To have friends, one must _____. -be friendly -be talkative -be entertaining
What was the intent of the truman doctrine?
During a reaction, the –OH group of an alcohol is replaced by a chlorine atom. Which type of reaction occurred? addition condensation elimination substitution
Temperature City Temperature (F°) Fraser −5° Grand Fork −1° Barrow −16° Harbin −10° The table shows the average temperature in January f